Palmela
| Location | Salgueirinha Solar Park |
| Date of grid connection | 25 July 2014 |
| Output | 4.4 MW |
| Annual Production | 7.2 million KWh |
Location of the Park
| Location | Salgueirinha Solar Park |
| Date of grid connection | 25 July 2014 |
| Output | 4.4 MW |
| Annual Production | 7.2 million KWh |