Torres Vedras
Location | Torres Vedras |
Date of grid connection | Construction will commence soon on a new 1 MW solar park at Torres Vedras |
Output | 1 MW |
Annual Production | 1,700,000 KWh |
Location of the Park
Location | Torres Vedras |
Date of grid connection | Construction will commence soon on a new 1 MW solar park at Torres Vedras |
Output | 1 MW |
Annual Production | 1,700,000 KWh |
Location of the Park